• Skip to main navigation
  • Skip to main content
  • Skip to footer
logo for Lakewood Instruments, LLC

Lakewood Instruments, LLC

Experience the Confidence from Bullet-Proof Water Controllers

  • Home
  • Products
    • Controllers
      • NexSys Boilers / Cooling Towers
      • 3175 Controller for Boilers and Cooling Towers
      • 1575e Boilers / Cooling Towers
      • 1520e pH
      • 1530e ORP
      • 140 Cooling Towers
      • 150 Boilers
      • OnSight Remote Access Communications System
    • Sensors
      • Cooling Conductivity
      • Boiler Conductivity
      • Process & Condensate Conductivity
      • pH Sensors
      • ORP Sensors for Cooling Towers
      • Trace Chemistry Sensors
    • Parts & Accessories
      • Mini-Panels
      • Valves
      • Seko Pumps
      • Water Meters
      • Plumbing Assemblies
      • Drum Level Switches & Sensors
      • Coupon Racks
  • Resource Center
    • Manuals
    • CutSheets
    • Quick-Start Guides
    • Blog
    • Catalog
    • Where to Buy
    • Place an Order
    • Connect With Us
    • Contact
    • Warranty & RMA Request Info
  • About
    • Lakewood History
    • Lakewood Partners – Find a Water Treater
    • Contact
  • Skip to menu toggle button
  • LinkedIn
  • Back to top ↑

Category: News

What Is K Factor In Water Meters?

Posted on: July 2, 2020 March 27, 2022 Written by: Joel Muetzel Comments: 0
Is my Paddle wheel or Magnetic water meter giving me the correct Signal and ratio for flow gallons/liters flowing through it? We’ll walk you through water flow meter calculation. Well, here is a test you can do in the field.…
Continue reading “What Is K Factor In Water Meters?”…

Search the site

Recent posts

02 Jun

ORP Control in Cooling Towers

Combat Microbiological Fouling in Cooling Systems ORP is an important factor in water testing and treatment quality. ORP, also known as Oxidation Reduction Potential, is a useful tool in measuring and combating microbial fouling in open loop cooling tower systems, which provide…
Continue reading “ORP Control in Cooling Towers”…
20 Apr

Spring Cooling Tower Start-up Tips

It is recommended that the cooling tower system is cleaned according to       ASHRAE Guideline 12-2000 Perform Component Maintenance and Check Sensor Response Pull out and clean the conductivity sensor, pH/ORP sensor(s) and flowswitch float. Use a soft steel…
Continue reading “Spring Cooling Tower Start-up Tips”…
02 Mar

Boiler Blowdown Controller Settings

Lakewood has two dedicated boiler controllers, the Model 150 and Boiler NexSys.  We also have two controllers (Models 1575e and 3175) that can be used for cooling tower applications as well as boilers.  Let’s talk about the controller settings that…
Continue reading “Boiler Blowdown Controller Settings”…
03 Nov

Boiler Controller Selection Guide

When your customer is ready to add automation or upgrade their boiler controller, use our Boiler Controller Selection Guide to pick the best choice. Lakewood has four different models of boiler controllers, and we want to help you sort out…
Continue reading “Boiler Controller Selection Guide”…

Customers Love Lakewood

We love the simplicity of the Lakewood controller menus - they allow us to set these systems up and move on with the confidence we did it right the first time. Water Treater customer since 2003

Careers

We hire outgoing, motivated team members that love to solve problems.

Right now we do not have any openings. If you are interested in joining a high-performing team, let us know so we can contact you at the appropriate time.

Connect with Us!

  • See Lakewood at AWT- Providence – booth 560
  • Follow Us on Linked In
  • AWT – For Professional Water Treaters

Recent Posts

02 Jun

ORP Control in Cooling Towers

Combat Microbiological Fouling in Cooling Systems ORP is an important factor in water testing and treatment quality. ORP, also known as Oxidation Reduction Potential, is a useful tool in measuring and combating microbial fouling in open loop cooling tower systems, which provide…
Continue reading “ORP Control in Cooling Towers”…
20 Apr

Spring Cooling Tower Start-up Tips

It is recommended that the cooling tower system is cleaned according to       ASHRAE Guideline 12-2000 Perform Component Maintenance and Check Sensor Response Pull out and clean the conductivity sensor, pH/ORP sensor(s) and flowswitch float. Use a soft steel…
Continue reading “Spring Cooling Tower Start-up Tips”…
02 Mar

Boiler Blowdown Controller Settings

Lakewood has two dedicated boiler controllers, the Model 150 and Boiler NexSys.  We also have two controllers (Models 1575e and 3175) that can be used for cooling tower applications as well as boilers.  Let’s talk about the controller settings that…
Continue reading “Boiler Blowdown Controller Settings”…
  • LinkedIn
  • Back to top ↑
© 2022 Lakewood Instruments, LLC | Back to top ↑
This website uses cookies to improve your experience. We'll assume you're ok with this, but you can opt-out if you wish. Cookie settingsACCEPT
Privacy & Cookies Policy

Privacy Overview

This website uses cookies to improve your experience while you navigate through the website. Out of these cookies, the cookies that are categorized as necessary are stored on your browser as they are essential for the working of basic functionalities of the website. We also use third-party cookies that help us analyze and understand how you use this website. These cookies will be stored in your browser only with your consent. You also have the option to opt-out of these cookies. But opting out of some of these cookies may have an effect on your browsing experience.
Necessary
Always Enabled
Necessary cookies are absolutely essential for the website to function properly. This category only includes cookies that ensures basic functionalities and security features of the website. These cookies do not store any personal information.
Non-necessary
Any cookies that may not be particularly necessary for the website to function and is used specifically to collect user personal data via analytics, ads, other embedded contents are termed as non-necessary cookies. It is mandatory to procure user consent prior to running these cookies on your website.
SAVE & ACCEPT